This week the architect's field notes for the
Southside Library include: "Work in progress: Concrete bond beam at East Patio. Perimeter slab insulation. Electrical rough in. Ducts are being placed. Steel stud punch list is being picked up. Plumbing supply and returns are in progress. Roofing has started over the Young Adults and is progressing over the Main Stacks area. Shade ramada is being fabricated."