Southside Library. The southeast portion of the slab (main portion of the stacks area) was poured on January 5. The southwest portion of the slab (Young Adult Study Room) was poured on Monday January 9. The finishers were out power troweling and hand troweling. More radiant tubing has been placed, and the majority of the stem wall installation has been placed. Construction photos always available on the Southside Progress page.