Rebar Grid, Radiant Tubing, Stem Wall

radiant tubing

This week's notes from the architect, about progress at the Southside Library:
"a. Concrete is being placed for column bases on the interior of the slab and some on the perimeter.
b. Rebar grid has been set and some of the radiant tubing has been placed in the south part of the slab. Tomorrow, the base course will be placed on the north side of the slab, and the rebar grid will be set over that.
c. The concrete subcontractor will close the footprint of the building. There is a portion of the stem wall that has been left open for vehicular access."